Posts Tagged ‘
Air Conditioning ’
Thursday, January 17th, 2013
The fluctuation of temperatures within a building can be an issue as it involves the use of air-conditioning or the heating system. In the 1960s, scientists started to develop and experiment PCMs (phase-change materials) which have for advantage to store and release the heat when needed. Thanks to it, a reduction of up to eight hours can be achieve and it could save between 50 to 70 % the energy consumption in a dwelling/building.
... this is only a preview.
Read in full →
Tags: Air Conditioning, Ceiling Tiles, Daytime absorption of heat, Energy Storage, green building, Night time release of heat, PCM, Phase-change material, thermal mass, thermal storage
Posted in
Blog |
No Comments »
Wednesday, August 8th, 2012
Syntegra Consulting has successfully undertaken the Air Conditioning Inspection of a number of industrial units part of Perkins Engines, in Peterborough. Syntegra undertook the ACI inspection of the two industrial units which are air conditioned buildings.


... this is only a preview.
Read in full →
Tags: ACI, AHU, Air Conditioning, air conditioning inspection, Air Handling Unit, Centralized systems, energy efficiency, energy performance building directive, energy recovery, EPBD, EPC, feed-in tariffs, FIT, FREE LED Lighting Feasibility, heat recovery, LED lighting, lighting technology, Low Zero Carbon Technologies, LZC, Photovoltaic, PV, PV design., Renewable Energy Technologies
Posted in
Case studies, Commercial, Industrial |
No Comments »
Wednesday, August 8th, 2012
Syntegra Consulting has successfully undertaken the Air Conditioning Inspection of the ADECCO office in Bouverie Street, London. Syntegra undertook the ACI inspection of the Bouverie Street office which is an air conditioned building.

... this is only a preview.
Read in full →
Tags: ACI, AHU, Air Conditioning, air conditioning inspection, Air Handling Unit, Centralized systems, energy efficiency, energy performance building directive, energy recovery, EPBD, EPC, feed-in tariffs, FIT, FREE LED Lighting Feasibility, heat recovery, LED lighting, lighting technology, Low Zero Carbon Technologies, LZC, Photovoltaic, PV, PV design., Renewable Energy Technologies
Posted in
Case studies, Commercial, Offices |
No Comments »
Wednesday, May 2nd, 2012
Syntegra Consulting has successfully undertaken the Air Conditioning Inspection of the NGK headquarters in Hemel Hempstead. Syntegra undertook the ACI inspection of the NGK building which is an air conditioned mixed use office and warehouse building.

... this is only a preview.
Read in full →
Tags: ACI, AHU, Air Conditioning, air conditioning inspection, Air Handling Unit, Centralized systems, energy efficiency, energy performance building directive, energy recovery, EPBD, EPC, feed-in tariffs, FIT, FREE LED Lighting Feasibility, heat recovery, LED lighting, lighting technology, Low Zero Carbon Technologies, LZC, Photovoltaic, PV, PV design., Renewable Energy Technologies
Posted in
Case studies, Commercial, Offices |
No Comments »
Tuesday, April 10th, 2012
Syntegra Consulting has successfully undertaken a 2No. energy audits and commercial Energy Performance Certificates for a 3,000 sqm and 4,000 sqm state of the art office centre in Takely (Stanstead) & Colchester (Essex).

... this is only a preview.
Read in full →
Tags: ACI, Air Conditioning, air conditioning inspection, colchester epc, commercial energy performance certificate, energy audit office, energy consultant, energy performance building directive, EPBD, EPC, stanstead epc
Posted in
Case studies, Commercial, Offices |
No Comments »