Syntegra Consulting successfully appointed as building services consultants and SAP assessors for the development at Wellington House, Slough. The development involves the conversion of the 1st floor office space into 8No. flats to current building Part L regulations.
Post 3076
Building services design and energy consultants – 8No. converted flats, Wellington House, Slough, SL1
Post 3071
M&E design consultants and BREEAM consultant – New Cultural building, 49 Baintree Street, London, E2 0EX
Syntegra Consulting successfully appointed as M&E design consultants and BREEAM assessors for the new Mosque development at 49 Baintree Street, London.
The scope includes:
- Mechanical and Electrical Building services design
- Above grd and below grd drainage services design
- Renewable technology design
- Energy Strategy and feasibility reports
Post 3062
Energy report and Air Conditioning Inspection – Getty Images, Camden Town, London, NW
Syntegra Consulting has successfully undertaken the Air Conditioning Inspection of Getty Images building in Camden town, London. Syntegra undertook the ACI inspection of the old Getty Images building which is an air conditioned office building in order to lease it to a new tenant. The ACI report together with the EPC were required as part of the legal documentation for the lease of the building.
Subscribe to our RSS Q&A feed and get answers to common questions relating to EPC's.






















































